Resource Well Pressurizer
Can be placed on a Resource Well to activate it by pressurizing the underground resource.</br>Once activated, Resource Well Extractors can be placed on the surrounding sub-nodes to extract the resource.</br>Requires Power. Overclocking increases the output potential of the entire Resource Well.
150
Power (MW)
20
Width (m)
20
Length (m)
23
Height (m)
Production Fluid Extractors Overclockable
Build cost: 200× Wire · 50× Rubber · 50× Encased Industrial Beam · 50× Motor
Extractor=