Versatile Framework Versatile Framework

Project Part #2. Ship with the Space Elevator to complete phases of Project Assembly.

It is impossible to craft this part manually, it has to be automated with an Assembler.

Recipes (2)

Versatile Framework [Tier 3] - Basic Steel Production

Assembler · 24s craft → 2× Versatile Framework (5/min)

1× Modular Frame12× Steel Beam

Flexible FrameworkAlternate [Tier 5] - Oil Processing

Manufacturer · 16s craft → 2× Versatile Framework (7.5/min)

1× Modular Frame6× Steel Beam8× Rubber

Related